Down to the Wire – John’s House Pt. 4

I have not had the nerve to ask John THE question: 

“Will the work be finished by April 30?”

Now that the electrical wiring is all done, John’s been working hard to meet his  self-imposed deadline.  But I know he’s had a couple of major life events to deal with recently.  So I waited a bit before checking in.

I find John working throughout this Easter weekend. For him, this is not a time to kick back and rest for the holidays.

As usual, he’s well prepared for this phase of work  — the plastering and painting.  He’s stocked up on supplies……

Blog Photo - John Paint Cans

For patching holes in walls and baseboard ….

Blog Photo - REd Room with Holes in Plaster

Repairing the plaster around the new light switches ….
Blog Photo - John Plastering Around Light Switch

Priming walls and painting the woodwork….

Blog Photo - John Yellow Room Primed

And the most delicate work of all:

Blog Photo - Green Room with Yellow room in BG

The walls and ceiling of this room.

Blog Photo - Hohn Rebuilt Green Room Medallion and CM

See that thing in the ceiling?  No, not the black thing – the white thing, to the left.  It’s a finely crafted medallion  – a gem rarely seen in houses today.  This medallion – along with the plaster ceiling and crown molding, was badly damaged by a water leak from the floor above some years ago.  John, intrepid soul, decided to repair them both.  But first, he had to stop the problem from recurring:

“A new eaves trough and downspouts solved this, which is what I did just after taking possession of the house.  Since then there has been no more water leaking into (the house).”

Blog Photo - John's Work on Ceiling and CM and Leaded windows

The features in this room are remarkable. The high ceilings. The medallion. The deep crown molding. The leaded windows.

Is there progress?  Heck, yes.

Blog Photo - Green Room and Leaded Windwos Complete

Have a look at this:

Blog Photo - John Yellow Room and Scaffold

And this:

Blog Photo - John Red Room FinishedAnd this:

Blog Photo - Finished Green Room

And this too.

Blog Photo - John Yellow Room Painted

Plus, John also finished up the wood flooring on the third floor.

Blog Photo - John finished floors

Seems to me like John just might get to keep his promise to Ann – that they’ll move in by month-end.  After all, he’s been working like the dickens.   But I don’t have the heart to ask him this, on top of everything he’s gone through lately.

So we’ll just have to find out together.

Stay tuned.

Photos by John Garside.

A Good Home, Electrical wiring, Home, Home Decor, Homes, Inspiration, Interior Design, Life in canada, Lifestyle, Prince Edward County, Restoration, Restoring old houses

The Dreaded Knob and Tube (John’s House, Pt. 3)

Ever heard of knob and tube?

Old knob and tube along with new wiring
Old knob and tube along with new wiring

It’s the kind of wiring used in old houses.  Like John Garside’s.

The gracious old house in lakeside  Prince Edward County, Ontario, has beautiful features.

Blog Photo - Picton Staircase 2

But behind those lovely features is knob and tube  — on the second and third floors of the beautiful home.  And that old knob and tube wiring can be dangerous.

Blog Photo - Picton House Exterior 2

“I knew the wiring was not quite fine,” John says.  “The chief electrician, Dan, and I spoke about the house and the work.  My comment: ‘ I want it to be beyond code’.  He replied: ‘very good’. ”

Blog Photo - Old wiring

It made sense to go above the basic requirements, or “beyond code”.  John didn’t intend to replace the new wiring for a long time.

He knew the  job would take a lot of time and involve “lots of new switches, plugs and all new wiring everywhere!”

Blog Photo - electrician and red walls

Which meant punching holes in beautiful plaster walls.

“Yes.  The holes are 4 inches in diameter and these allow them to fish the wires through the ceiling and around the joists.  Very complicated and very time consuming.  But it saves the plaster and the crown moldings!!”

Blog Photo - electrician working on ceiling

Blog Photo - Yellow room,s econd floor

The plaster and crown moldings in most of the rooms are remarkably beautiful.  (I’ll show them to you in next week’s story.) They’d cost a ton of money – and time –  to replace today.

But boring 4 inch holes isn’t enough access to remove and replace all of the wiring.  John had to rip up the floors on the third floor.

Blog Photo - Old floors more ripped up

“To get rid of all the knob & tube wiring on the second floor it was a better to remove the 3rd floor flooring so we would have access to the ceilings and walls of the 2nd floor”, John explains. ” That way the new wires could be sent up from the basement to the third floor, then dropped down into the appropriate room on the second floor.  This saved a great deal of grief!”

I think I understand that…..

Electricians Bob and Brian did the wiring work.  That left John to do the rest… the re-plastering on the second floor,  the replacement of the  flooring on the third.

“I am working on it right now!” John says.

Blog Photo - Old floors and work stand

Blog Photo - New Floors in progress wide shot

He’s working hard.  Time flies when you have a promise to keep.

Blog Photo - John's third floor - new floors in progress

John  promised his wife Ann that they’d move in by the end of April.  That’s three weeks away.

And there’s still a lot to do.

So, fingers crossed…..

And good luck to John.

Photos  by John Garside.